Alan Traynor Consulting Engineers were employed by Mc Aree Engineering in Monaghan to provide the Civil and Structural Engineering services for the renovation and extension of their Manufacturing Plant in Co Monaghan.
The New Portal Frame structure was formed utilising structural steel portal frames. Ground conditions on the site were poor so a pile and ground beam solution were used to carry the new structural steel frame extension. A pile supported fibre reinforced floor slab was also utilised.
During the Construction of the Manufacturing Unit Alan Traynor Consulting Engineers Ltd attended fortnightly Deign Team Meetings and monitored all the works to ensure compliance with the current Building Regulations.
Alan Traynor Consulting Engineers also acted as Prefect Supervisor Design Process to ensure compliance with Health and Safety Legislation.